Understanding Stakeholder Engagement in Large-Scale Engineering Projects: A Qualitative Study

Authors

    Bence Varga Department of Civil Engineering, Budapest University of Technology and Economics, Budapest, Hungary
    Anna Kovacs * Department of Environmental Engineering, University of Pannonia, Veszprem, Hungary anna.kovacs.hu@gmail.com
    Gabor Toth Department of Civil Engineering, Budapest University of Technology and Economics, Budapest, Hungary

Keywords:

stakeholder engagement, large-scale engineering projects, qualitative research, project management, Hungary, stakeholder management, infrastructure projects

Abstract

This study aimed to explore how professionals involved in large-scale engineering projects understand, organize, and sustain stakeholder engagement across complex project environments in Hungary. A qualitative research design was adopted to obtain an in-depth understanding of stakeholder engagement practices from the perspectives of professionals directly involved in large-scale engineering projects. Data were collected through semi-structured interviews with 24 participants from Hungary, including project managers, engineering leads, procurement specialists, public-sector representatives, environmental and social impact experts, and community liaison officers. Participants were selected through purposive sampling to ensure variation in role, sector, and professional experience. Interviews continued until theoretical saturation was reached, with no substantially new codes emerging after the twenty-first interview and three additional interviews conducted to confirm saturation. Interviews were audio-recorded with consent, transcribed verbatim, anonymized, and analyzed using thematic analysis. NVivo software was used to organize transcripts, support systematic coding, compare categories, and develop higher-order themes. The analysis generated four main categories: dynamic stakeholder identification and prioritization, communication as a mechanism of alignment, trust and legitimacy in contested project environments, and institutional-contractual constraints on engagement. Participants described stakeholder engagement as a continuous and adaptive process rather than a fixed procedural requirement. Effective engagement depended on early mapping of formal and informal actors, transparent communication, responsiveness to local concerns, and the ability to negotiate competing expectations among government bodies, contractors, communities, consultants, and end users. However, fragmented governance, political pressure, rigid contractual arrangements, and delayed communication often reduced the quality of engagement. Stakeholder engagement in large-scale engineering projects is best understood as a relational, political, and iterative process embedded in technical, institutional, and social complexity. The findings suggest that successful engagement requires more than compliance-based consultation; it requires continuous stakeholder intelligence, credible communication, trust-building, and flexible governance mechanisms that allow project teams to respond to emerging concerns throughout the project life cycle.

Downloads

Download data is not yet available.

References

Aaltonen, K. (2011). Project stakeholder analysis as an environmental interpretation process. International Journal of Project Management, 29(2), 165–183. https://doi.org/10.1016/j.ijproman.2010.02.001

Aaltonen, K., & Kujala, J. (2016). Towards an improved understanding of project stakeholder landscapes. International Journal of Project Management, 34(8), 1537–1552. https://doi.org/10.1016/j.ijproman.2016.08.009

Bourne, L., & Walker, D. H. T. (2005). Visualising and mapping stakeholder influence. Management Decision, 43(5), 649–660. https://doi.org/10.1108/00251740510597680

Braun, V., & Clarke, V. (2006). Using thematic analysis in psychology. Qualitative Research in Psychology, 3(2), 77–101. https://doi.org/10.1191/1478088706qp063oa

Creswell, J. W., & Poth, C. N. (2018). Qualitative inquiry and research design: Choosing among five approaches (4th ed.). SAGE Publications.

Cuppen, E., Rekveldt, M. G. C., Pikaar, E., & Mehos, D. C. (2016). Stakeholder engagement in large-scale energy infrastructure projects: Revealing perspectives using Q methodology. International Journal of Project Management, 34(7), 1347–1359. https://doi.org/10.1016/j.ijproman.2016.01.003

Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19. https://doi.org/10.1002/pmj.21409

Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003). Megaprojects and risk: An anatomy of ambition. Cambridge University Press.

Freeman, R. E. (1984). Strategic management: A stakeholder approach. Pitman.

Guest, G., Bunce, A., & Johnson, L. (2006). How many interviews are enough? An experiment with data saturation and variability. Field Methods, 18(1), 59–82. https://doi.org/10.1177/1525822X05279903

Kallio, H., Pietilä, A. M., Johnson, M., & Kangasniemi, M. (2016). Systematic methodological review: Developing a framework for a qualitative semi-structured interview guide. Journal of Advanced Nursing, 72(12), 2954–2965. https://doi.org/10.1111/jan.13031

Lehtinen, J., Aaltonen, K., & Rajala, R. (2019). Stakeholder management in complex product systems: Practices and rationales for engagement and disengagement. Industrial Marketing Management, 79, 58–70. https://doi.org/10.1016/j.indmarman.2018.08.011

Lincoln, Y. S., & Guba, E. G. (1985). Naturalistic inquiry. SAGE Publications.

Mitchell, R. K., Agle, B. R., & Wood, D. J. (1997). Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts. Academy of Management Review, 22(4), 853–886. https://doi.org/10.5465/amr.1997.9711022105

Mok, K. Y., Shen, G. Q., & Yang, J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), 446–457. https://doi.org/10.1016/j.ijproman.2014.08.007

Olander, S. (2007). Stakeholder impact analysis in construction project management. Construction Management and Economics, 25(3), 277–287. https://doi.org/10.1080/01446190600879125

Olander, S., & Landin, A. (2005). Evaluation of stakeholder influence in the implementation of construction projects. International Journal of Project Management, 23(4), 321–328. https://doi.org/10.1016/j.ijproman.2005.02.002

Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK® Guide) (7th ed.). Project Management Institute.

Rowley, T. J. (1997). Moving beyond dyadic ties: A network theory of stakeholder influences. Academy of Management Review, 22(4), 887–910. https://doi.org/10.5465/amr.1997.9711022110

Published

2026-07-01

Submitted

2026-02-10

Revised

2026-05-07

Accepted

2026-05-19

Issue

Section

Articles

How to Cite

Varga, B., Kovacs, A., & Toth, G. (2026). Understanding Stakeholder Engagement in Large-Scale Engineering Projects: A Qualitative Study. Multidisciplinary Engineering Science Open, 1-14. https://jmesopen.com/index.php/jmesopen/article/view/67